Devon Knowles  
 
  Two Red, vinyl, flood lights, mylar, wood, each form is approx., 60" / 9.5" / 10", 2001
next arrow
Two Red was carried out over a 12-hour period. The land was marked with two lines - markers for excavation to occur. Once completed mylar strips were laid within the trenches followed by a series of floodlights and then finished off with red vinyl. When the power was activated the entire site was saturated with a glowing red light coming from the two ground formations.